media
Ground Water Drilling Permit

MIZORAM

Beneficiary Oriented Solution - State

PHED

Published By: SeMT

Under the Mizoram Ground Water (Control & Regulation) Act, 2023 and the Rules, 2024, all groundwater extraction requires a permit. The application must include details such as purpose, usage period, location, and population served (if for drinking water).

Project Details

Brief Background

Under the Mizoram Ground Water (Controler & Regulation) Act, 2023, and the Rules, 2024, all groundwater extraction requires a permit.

Objective

- To regulate and control the extraction of groundwater across Mizoram.
- To ensure sustainable use and conservation of groundwater resources.
- To promote responsible water usage and protect the environment for long-term water security.

Benefits

- Ensures controlled and legal extraction of groundwater, reducing overuse and depletion.
- Reduces illegal drilling.borewells through proper monitoring and permissions.
- Protects communities by ensuring safe and regulated access to groundwater sources.

Implementation Methodology

Requirement gathering → Develop application → Integration of payment gateway → Testing → Go Live

Implementing Agency Details

Name of implement agency

Siruk Consultancy

Name of Representative of Agency

Sunday Lalbiaknia

Representative Agency Email

contact@siruk.io

Representative Agency Phone / Mobile

8415966975

Availability of application for implementation in Other States

(Details on how this application can be made available to other State)

Yes

Technology Details

Technology Architecture

Additional Image

Contact Details

Er. Zodinthari, Engineer-In-Chief, Public Health Engineering Department (PHED)

phedmizoram@yahoo.com

3892322244

Website Link

phedmizoram.in